Aim: application to a design project of theoretical knowledge -acquired in preceding semesters and further increasing –about building energy efficiency and thermal, visual and acoustic comfort

Task: To develop the concept [orientation, structure, material, energy production] and to design of a prefabricated zero energy living unit (stand alone) for an individual or a couple

Energy: On-site energy production

Water: Water harvesting and an-site treatment

ASSIGNMENT 01 [submission 1 April 2010] 30% of final mark

Submission format: Poster A1

Site: Auckland City Campus [see map]

Energy strategy [losses/gains]:

Concept for energy savings + on-site energy production

for heating/cooling, DHW and lighting

Compact layout [unit = container size; modular]

Design Technology: Prefabrication system

Structure and materials

Water: Water harvesting and an-site treatment

ASSIGNMENT 02 [submission 10 June 2010] 70% of final mark